S. No. Name of Work State Name of Employer Value of Contract Completed % age
1 Construction of Dimapur Bypass (Assam Portion) of 4/6 lane pavement on EPC basis from existing Km 159.400 of NH- 36 to existing Km 102.500 of NH-39 and up to end point of Assam portion [Design Km 118.050 to design Km 132.375] (length 14.325 Km) in the State of Assam under Phase- A of SARDP-NE". Assam NHIDCL Rs. 403.49 Crores 97%
2 Four Laning of Basukinath to Deoghar Section of NH 114A from km 85+081 to Km 130+240 on NH-114A under NHDP Phase - IV in the state of Jharkhand on Hybrid Annuity mode Jharkhand NHAI Rs. 810.00 Crores 40%
3 Improvement/Up-gradation to 4-Lane Divided Highway from Kuraopokpi to Sekmai section (Pkg- 5A) of Imphal Kohima Road (NH-39) (Design Chainage from Km 287+000 to Km 297+700) in the state of Manipur Manipur NHIDCL Rs. 122.40 Crores Yet to Start
4 Improvement/Widening of National Highway No. 217 (Dainadubi-Darugiri Section) to Two lane with paved shoulder in the state of Meghalaya, from design Km 0+000 to Km 40+840 (Design Length = 40.840 Km) (existing Km 8+600 to Km 53+000 of Old NH-62) under Bharatmala Pariyojana (Lot-1) Pkg-1B on EPC mode. Meghalaya NHIDCL Rs.308.92 Crores Yet to Start
5 Construction of Dubrajpur Bypass with 4 lane configuration of length 5.676 km on NH 60 (new NH 14) from design chainage 0.00 (existing km 316.135 on NH 60) to design chainage 5.676 (existing km 320.980 on NH 60) in the district of Birbhum, West Bengal in EPC Mode. (Job No. 014-B-2022-23/518) West Bengal NHIDCL Rs. 191.49 Crores Yet to Start